104國(guó)道工程
-
Bridge
項(xiàng)目
-
天
工期
-
9.91km2km2
施工面積
項(xiàng)目詳情
The reconstruction project of Pingyang Guo Zhuang to Chenxia à section of National Highway 104 is 9.91 kilometers long. It is of Class I highway standard and asphalt concrete pavement, with a design speed of 80 kilometers per hour, two-way four lanes, and a roadbed width of 24.5 meters, of which 4.5 meters of auxiliary lanes are added on both sides of the crossing section of Kunyang Town, and the roadbed width is 33.5 meters. The total project investment is 602 million.